Skip to main content
+1 (888) 996-7619|18+ Years of Excellence|
Cargo port serving shipments Ecuador

Destination guide

Shipping Heavy Equipment to Ecuador

In 2025 the United States reported exporting 359 machines worth $44.4 million to Ecuador in the 15 classes we track, up 26% on 2024. None of the carrier schedules we track lists a direct call in Ecuador, so we confirm the routing with each quote. RoRo service: Regular from the East and Gulf Coast, limited from the West Coast. Duty and VAT on a $100,000 CIF excavator come to $15,000, or 15% of its value.

U.S. machines shipped here in 2025[1]
359
Duty and VAT on a $100,000 CIF excavator[2]
$15,000
RoRo from the East and Gulf Coast[3]
Regular

The four ways to ship machinery to Ecuador

Container, flat rack, RoRo and breakbulk, with where each one lands. RoRo availability is by U.S. coast; the other three are booked on the services that run when the cargo is ready.

The four ways to ship machinery to Ecuador
MethodFrom the U.S.Where it lands, and conditions
ContainerBooked on requestContainer ports: Port of Guayaquil, Port of Manta. No schedule we track lists a direct call, so the carrier and any transshipment are confirmed at booking.
Flat rackBooked on requestFor machines too wide or tall for a closed box, on container lines that accept out-of-gauge cargo. Discharge at Port of Guayaquil, Port of Manta, subject to the terminal taking flat racks.
RoRoRegular from the East and Gulf Coast, limited from the West CoastRoRo ports: Port of Guayaquil. Carriers call these routes on their schedules[3]; we confirm the next sailing at booking.
BreakbulkLiner breakbulk or charterFor cargo too large or heavy for a flat rack, loaded by ship or shore crane. Breakbulk and heavy-lift ports: Port of Guayaquil, Port of Manta.

What the U.S. ships to Ecuador

U.S. exports to Ecuador by machine class, 2025 against 2024, as reported by the United States to UN Comtrade[1]. Units are as declared; the average is customs value divided by units.

What the U.S. ships to Ecuador
Machine classUnits 2025Units 2024Change in unitsValue 2025Average per unit[1]
Diesel generator sets7764+20%$33.2 million$431 thousand
Excavators4427+63%$1.61 million$36.6 thousand
Wheel loaders3911+255%$1.59 million$40.7 thousand
Backhoes and other excavating machines5244+18%$1.51 million$29 thousand
Forklifts and telehandlers4550−10%$1.29 million$28.6 thousand
Crushers282+1,300%$1.1 million$39.2 thousand
Crawler tractors121+1,100%$1.05 million$87.4 thousand
Crawler dozers3421+62%$1.03 million$30.2 thousand
Truck-mounted cranes31+200%$874 thousand$291 thousand
Wheeled tractors1158−81%$486 thousand$44.2 thousand
Self-propelled drill rigs101+900%$364 thousand$36.4 thousand
Crawler and rough-terrain cranes12−50%$250 thousand$250 thousand
Combine harvesters10–$45 thousand$45 thousand
Motor graders12−50%$40 thousand$40 thousand
Off-highway dump trucks10–$30.8 thousand$30.8 thousand

A dash means the quantity was not reported for that year. Classes the U.S. did not ship here in either year are left out.

Import duty on machinery in Ecuador

The most-favoured-nation (MFN) duty applied to each machine class, as a simple average of the national tariff lines under its HS subheading[2]. Preferential rates under trade agreements can be lower.

Import duty on machinery in Ecuador
Machine classHS subheadingMFN applied dutyRange across linesTariff year[2]
Excavators8429.520%–2023
Wheel loaders8429.510%–2023
Crawler dozers8429.110%–2023
Motor graders8429.200%–2023
Backhoes and other excavating machines8429.590%–2023
Crawler and rough-terrain cranes8426.410%–2023
Forklifts and telehandlers8427.200%–2023
Off-highway dump trucks8704.102%0–5%2023
Wheeled tractors8701.930%–2023
Crawler tractors8701.300%–2023
Combine harvesters8433.510%–2023
Self-propelled drill rigs8430.415%–2023
Crushers8474.2016%5–25%2023
Diesel generator sets8502.1310%0–20%2023
Truck-mounted cranes8705.100%–2023

The range shows the lowest and highest line within the subheading; a dash means every line has the same rate.

Worked example: a $100,000 excavator

Import duty: 0% of $100,000 CIF is $0 (HS 8429.52, 2023 tariff)[2].

IVA: 15% of the duty-inclusive $100,000 is $15,000 (SENAE (Ecuador), checked June 2026)

Total duty and tax: $15,000, or 15% of CIF.

  • Excise, port charges, broker fees and any registration tax are extra. The final rate depends on the exact tariff line your broker declares.

Vehicles and other taxes

Ecuador (which uses the US dollar) restricts used-vehicle imports to those under 5 years old and applies an import duty plus 15% VAT (IVA) and a special consumption tax (ICE). Import licences/quotas can apply.

Source: SENAE (Ecuador), checked June 2026.

  • Import duty: Import tariff by type (confirm by HS code)
  • VAT: IVA 15%
  • Other charges: Special consumption tax (ICE); import licensing/quotas may apply

Rules for used machinery in Ecuador

Used road-building (equipo caminero) and farm equipment may be imported only if it is 15 model years old or newer. Machinery over 3.5 tonnes also needs a Ministry of Infrastructure (MIT) non-automatic import licence before shipment. No U.S. trade agreement applies.

  • Age limit: COMEX Resolution 51, Art. 3: used road equipment (equipo caminero), agricultural equipment and their parts may be imported freely only if the model year is within the 15 years before import. Subheading 8704.10.00.90 is included.[4]
  • Licence or permit: MIT non-automatic import licence (pre-shipment) for heavy cargo vehicles, machinery and road equipment of 3.5 t gross weight or more. File via the VUE single window with an apostilled spec sheet and RUC; valid 90 days.[5]
  • Documents: Required documents: commercial invoice, bill of lading, insurance policy, RUC tax number, certificate of origin when applicable. Also an INEN-1 certificate when applicable, plus gross and net weights per item. Clearance runs through ECUAPASS with a Central Bank e-signature.[6]
  • Conformity: An INEN-1 standards-compliance certificate is required when the product falls under an Ecuadorian technical regulation.[6]

Documents for Ecuador

The papers a machinery shipment to Ecuador usually needs at destination. Your consignee and their customs broker confirm the list for the exact cargo.

  • Commercial Invoice
  • Packing List
  • Bill of Lading
  • Certificate of Origin
  • Import Declaration
  • INEN Certificate (if required)
  • Equipment Specifications

U.S. export rules

What every shipment from the U.S. has to clear before it sails, whatever the destination.

Electronic Export Information (15 CFR 30)U.S. Census Bureau

Electronic Export Information is filed in AES for each Schedule B number worth more than $2,500 going to one consignee on one conveyance, and for every vehicle whatever its value. For vessel cargo it is due at least 24 hours before loading; the Internal Transaction Number (ITN) goes to the carrier with the booking.[7][8]

Applies to: Any Schedule B line over $2,500, and every vehicle

Used self-propelled vehicles: 72-hour ruleU.S. Customs and Border Protection

U.S. regulations count self-propelled construction and agricultural machinery as vehicles. A used one must be filed in AES at least 72 hours before export, whatever its value or destination, and the ITN, the VIN or serial number and the ownership documents go to CBP at the port of export. Filing after departure is not allowed.[9][10][8]

Applies to: Used machines that drive: excavators, loaders, dozers, tractors, trucks

ISPM 15 wood packagingIPPC, administered in the U.S. by USDA APHIS

Wood packaging and dunnage must be heat-treated to a core temperature of 56 °C for at least 30 minutes, or fumigated, and carry the IPPC mark with the US country code, the facility number and HT or MB. Marked wood can be reused; repaired or remanufactured wood must be treated and marked again.[11]

Applies to: Crates, skids, blocking and dunnage

Export classification under the EAR (ECCN or EAR99)BIS (U.S. Department of Commerce)

An item subject to the EAR is either listed on the Commerce Control List under an Export Control Classification Number (ECCN) or classified EAR99, the basket for items not listed. The ECCN’s reasons for control, read against the Commerce Country Chart, decide whether the destination needs a license. An EAR99 item rarely needs one, but no item, EAR99 included, may go to a person under a denial order or to a prohibited end use or end user without BIS authorization.[12][13][14]

Applies to: Every export of goods subject to the Export Administration Regulations

Clearance notes for Ecuador

  • Guayaquil is the main gateway; Manta serves as an alternative Pacific port.
  • Confirm current import licensing/quota status with an Ecuadorian broker.

Questions buyers ask

How much heavy equipment does the U.S. ship to Ecuador?

U.S. exporters reported 359 machines worth $44.4 million to Ecuador in 2025 across 15 machine classes, up 26% on 2024. The largest class by value was diesel generator sets, at $33.2 million. Figures are U.S. export declarations reported to UN Comtrade.

How long does shipping from the U.S. to Ecuador take?

None of the carrier schedules we track lists a direct call in Ecuador. Cargo moves on container lines, usually through a transshipment hub, or on a RoRo or breakbulk sailing to Port of Guayaquil; we confirm the current routing and transit with each quote.

Can I ship machinery to Ecuador by RoRo?

RoRo service: Regular from the East and Gulf Coast, limited from the West Coast. RoRo suits machines that drive or tow on board. Ports that take RoRo cargo: Port of Guayaquil. Where RoRo does not run, machines ship on flat racks or as breakbulk.

What duty and VAT apply to a used excavator in Ecuador?

The MFN duty on excavators averages 0% of CIF, and IVA is 15% on the duty-inclusive value. On a $100,000 CIF excavator that comes to $15,000 before excise, port and broker charges.

Which rules apply to used machinery in Ecuador?

Used road-building (equipo caminero) and farm equipment may be imported only if it is 15 model years old or newer. Machinery over 3.5 tonnes also needs a Ministry of Infrastructure (MIT) non-automatic import licence before shipment. No U.S. trade agreement applies.

Which documents do I need to ship to Ecuador?

A shipment to Ecuador usually needs: Commercial Invoice, Packing List, Bill of Lading, Certificate of Origin, Import Declaration, INEN Certificate (if required), Equipment Specifications. From the U.S., the export filing (EEI) goes in before loading, and titled machines need their title at the port 72 hours before export.

Export checklist (PDF)

A one-page checklist with the facts on this page for shipping Ecuador: methods, duty, rules and documents. Give it to your customs broker.

Download the checklist

Sources

Every figure on this page comes from the documents below, each checked on the date shown. Carriers and authorities revise them, so we confirm the current figure when we book.

  1. [1]World Bank WITS, UN Comtrade: exports reported by the United States, checked October 18, 2026
  2. [2]UNCTAD TRAINS via World Bank WITS: MFN applied tariff, checked October 18, 2026
  3. [3]Höegh Autoliners, Main trade routes (Annual Report 2023), checked October 18, 2026
  4. [4]COMEX (gob.ec) - Resolución 51: Disposiciones para importaciones de vehículos, piezas…, checked October 2026
  5. [5]Ministerio de Infraestructura y Transporte (gob.ec) - Autorización de Importación (Licencias de Importación), checked October 2026
  6. [6]ITA (trade.gov) - Ecuador Country Commercial Guide: Import Requirements and Documentation, checked October 2026
  7. [7]eCFR, 15 CFR 30.37 Miscellaneous exemptions (Foreign Trade Regulations), checked October 18, 2026
  8. [8]U.S. Census Bureau, Foreign Trade Regulations FAQs, checked October 18, 2026
  9. [9]eCFR, 19 CFR 192.1 Definitions (used self-propelled vehicles), checked October 18, 2026
  10. [10]U.S. Customs and Border Protection, Exporting used self-propelled vehicles, checked October 18, 2026
  11. [11]USDA APHIS, Export ISPM 15-compliant wood packaging material, checked October 18, 2026
  12. [12]eCFR, 15 CFR 734.3 Items subject to the EAR (EAR99), checked October 18, 2026
  13. [13]eCFR, 15 CFR 738.4 Determining whether a license is required, checked October 18, 2026
  14. [14]eCFR, 15 CFR 732.3 Steps regarding the ten general prohibitions, checked October 18, 2026

Send us the machine and the destination

Give us the model or the measured dimensions and weight. We come back with the method, the sailing and a price, and the figures behind them.