Heavy lift shipping for the heaviest pieces

Heavy lift

Heavy lift shipping for the heaviest pieces

Pieces too heavy for a flat rack go on a roll trailer up to 154 US tons (140 t)[2], on a heavy-lift ship whose two cranes lift up to 2,205 US tons (2,000 t) together[1], or by barge to the ship when no road route takes them[3].

combined crane lift on the heaviest ships in one heavy-lift fleet[1]
2,205 US tons (2,000 t)
cargo on the heaviest roll trailers in one RoRo fleet[2]
154 US tons140,000 kg
capacity of a 250 ft deck barge at 3 ft freeboard[3]
3,091 short tons
payload of the AN-124 charter aircraft[4]
132 US tons120,000 kg

Which heavy lift method

Heavy lift methods compared
MethodUse it whenAvoid it when
Super heavy liftA single piece over the roll trailer limit, moved by modular trailer or barge and lifted by ship’s cranes[1].A roll trailer takes it on a RoRo ship[2].
Crane liftingLoading, unloading or setting a piece at a plant, yard or site.The terminal’s own cranes do the lift at the port.
Roll trailerThe piece is up to 154 US tons (140 t) and a RoRo ship calls the port[2].It is longer or heavier than the trailers on the route.
Air charterA piece up to 132 US tons (120 t) is needed in days, not weeks[4].An ocean sailing meets the date.

Container, flat rack, RoRo or breakbulk?

We quote in this order because it is usually cheapest first. Most machines that look too big for a box fit once our crew takes off the bucket, boom, cab or wheels; larger ones are taken further apart across several containers, and pieces too big or heavy for a flat rack or roll trailer go breakbulk.

01Container

Work needed
We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
Destinations
Widest: almost every port worldwide, plus inland delivery by rail.
Typical cost
Usually the lowest, with no out-of-gauge surcharges.
Protection
Sealed steel box; loose parts and attachments travel locked inside.
Best for
Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.

02Flat rack

Work needed
Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
Destinations
Most container ports, on the same vessels as containers.
Typical cost
Moderate; rises with every centimetre out of gauge.
Protection
Open to the weather; we protect cabs, electronics and hydraulics.
Best for
Excavators, dozers and loaders too wide for a container door.

03RoRo

Work needed
Drives on assembled; non-runners go on a roll trailer.
Destinations
Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
Typical cost
Often competitive for large self-propelled machines where a lane exists.
Protection
Below deck, but loose items and attachments cannot ride inside the cab.
Best for
Running machines going to a port with regular RoRo sailings.

04Breakbulk

Work needed
Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
Destinations
Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
Typical cost
Usually the highest for a single small machine; often the only option for the largest pieces.
Protection
In the hold or lashed on deck; we crate, wrap and protect exposed parts.
Best for
Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.

What heavy-lift ships can lift

Ship types in one heavy-lift operator’s published fleet list. The ship on the fixture, not the type, sets the limit.

Heavy-lift ship types: cranes, hold and deck space
Ship typeCranesCombined liftHold (L × W × H)Free deck space[1]
Type 1831,102 US tons (1,000 t) × 22,205 US tons (2,000 t)351 ft 5 in × 55 ft 9 in × 44 ft 3 in (107.10 × 17.00 × 13.50 m)3,215–3,372 m²
Orca882 US tons (800 t) × 21,764 US tons (1,600 t)351 ft 1 in × 60 ft 8 in × 43 ft 8 in (107 × 18.5 × 13.3 m)3,330 m²
Type 176772 US tons (700 t) × 2, plus 386 US tons (350 t)1,543 US tons (1,400 t)351 ft 5 in × 55 ft 9 in × 43 ft (107.10 × 17.00 × 13.10 m)2,918 m²
Type 116496 US tons (450 t) × 2992 US tons (900 t)309 ft 3 in × 53 ft 2 in × 39 ft 8 in (94.25 × 16.20 × 12.08 m)2,311 m²

Rules that apply

Federal truck size and weight limits (23 CFR 658)FHWA

On the Interstate system a truck may gross 80,000 lb, with 20,000 lb on a single axle and 34,000 lb on a tandem; on the National Network the load may be 102 in wide. There is no federal height limit: states set 13.6 to 14.6 ft. A load over any of these needs an oversize or overweight permit from every state on the route.[5]

Applies to: Every road move to and from the port

Cranes and derricks in construction (29 CFR 1926 Subpart CC)OSHA

The crane may only be set up where the ground is firm, drained and graded enough, with mats or cribbing if needed, to meet the manufacturer’s support and level requirements. The operator must be trained, certified and evaluated. Anyone hooking or guiding a load inside the fall zone works with a load rigged by a qualified rigger, and a signal person is required when the operator cannot see the load. Near power lines up to 350 kV, one permitted method keeps the crane, load line and load at least 20 ft away.[6]

Applies to: Crane lifts at U.S. job sites, yards and plants

Electronic Export Information (15 CFR 30)U.S. Census Bureau

Electronic Export Information is filed in AES for each Schedule B number worth more than $2,500 going to one consignee on one conveyance, and for every vehicle whatever its value. For vessel cargo it is due at least 24 hours before loading; the Internal Transaction Number (ITN) goes to the carrier with the booking.[7][8]

Applies to: Any Schedule B line over $2,500, and every vehicle

Questions about heavy lift

What weight counts as heavy lift?

There is no single threshold. In practice it is a piece too heavy for a flat rack on its footprint or for the roll trailers on the route, so it is lifted by ship’s or shore cranes.

What is the heaviest piece a ship can lift?

In one current heavy-lift fleet, 2,205 US tons (2,000 t), with two 1,102 US tons (1,000 t) cranes working together. Heavier pieces are rolled aboard or carried on semi-submersible ships.

How does a very heavy piece reach the port?

On a multi-axle trailer under permits from every state on the route, or by barge when the plant is on a waterway and no road route takes it.

Our Heavy Lift Services

  • Super Heavy Lift Transport

    A piece of hundreds of tonnes goes to the water on a multi-axle trailer under state permits or by deck barge, then aboard a heavy-lift ship whose cranes lift up to 2,205 US tons (2,000 t) together.

  • Crane & Lifting Services

    A crane lift at a U.S. plant, yard or site follows OSHA’s crane rules: firm, graded ground, a certified operator, a qualified rigger for anyone in the fall zone, a signal person when the operator cannot see the load, and distance from power lines.

Sources

Every figure on this page comes from the documents below, each checked on the date shown. Carriers and authorities revise them, so we confirm the current figure when we book.

  1. [1]SAL Heavy Lift, Fleet list (April 2026), checked October 18, 2026
  2. [2]Wallenius Wilhelmsen, Cargo handling equipment, checked October 18, 2026
  3. [3]McDonough Marine Service, Deck cargo barge fleet (capacity by freeboard), checked October 18, 2026
  4. [4]Antonov Airlines, AN-124 Ruslan charter (payload and cargo cabin), checked October 18, 2026
  5. [5]FHWA, Commercial Vehicle Size and Weight Program (23 CFR 658), checked October 18, 2026
  6. [6]eCFR, 29 CFR 1926 Subpart CC Cranes and Derricks in Construction, checked October 18, 2026
  7. [7]eCFR, 15 CFR 30.37 Miscellaneous exemptions (Foreign Trade Regulations), checked October 18, 2026
  8. [8]U.S. Census Bureau, Foreign Trade Regulations FAQs, checked October 18, 2026

Send us the machine and the destination

Give us the model or the measured dimensions and weight. We come back with the method, the sailing and a price, and the figures behind them.