Skip to main content
+1 (888) 996-7619|18+ Years of Excellence|
Cargo port serving shipments Pakistan

Destination guide

Shipping Heavy Equipment to Pakistan

In 2025 the United States reported exporting 246 machines worth $7.63 million to Pakistan in the 15 classes we track, up 86% on 2024. None of the carrier schedules we track lists a direct call in Pakistan, so we confirm the routing with each quote. RoRo service: Limited from all U.S. coasts. Duty and VAT on a $100,000 CIF excavator come to $18,000, or 18% of its value.

U.S. machines shipped here in 2025[1]
246
Duty and VAT on a $100,000 CIF excavator[2]
$18,000
RoRo from the East and Gulf Coast[3]
Limited

The four ways to ship machinery to Pakistan

Container, flat rack, RoRo and breakbulk, with where each one lands. RoRo availability is by U.S. coast; the other three are booked on the services that run when the cargo is ready.

The four ways to ship machinery to Pakistan
MethodFrom the U.S.Where it lands, and conditions
ContainerBooked on requestContainer ports: Port of Karachi, Port Qasim. No schedule we track lists a direct call, so the carrier and any transshipment are confirmed at booking.
Flat rackBooked on requestFor machines too wide or tall for a closed box, on container lines that accept out-of-gauge cargo. Discharge at Port of Karachi, Port Qasim, subject to the terminal taking flat racks.
RoRoLimited from all U.S. coastsRoRo ports: Port of Karachi. Carriers call these routes on their schedules[3]; we confirm the next sailing at booking.
BreakbulkLiner breakbulk or charterFor cargo too large or heavy for a flat rack, loaded by ship or shore crane. Breakbulk and heavy-lift ports: Port of Karachi, Port Qasim.

What the U.S. ships to Pakistan

U.S. exports to Pakistan by machine class, 2025 against 2024, as reported by the United States to UN Comtrade[1]. Units are as declared; the average is customs value divided by units.

What the U.S. ships to Pakistan
Machine classUnits 2025Units 2024Change in unitsValue 2025Average per unit[1]
Wheel loaders9251+80%$2.71 million$29.5 thousand
Motor graders3923+70%$1.61 million$41.3 thousand
Backhoes and other excavating machines6031+94%$1.49 million$24.8 thousand
Excavators4319+126%$1.34 million$31.2 thousand
Crawler dozers60–$169 thousand$28.2 thousand
Crushers110%$90.4 thousand$90.4 thousand
Self-propelled drill rigs30–$88.5 thousand$29.5 thousand
Crawler and rough-terrain cranes10–$80 thousand$80 thousand
Off-highway dump trucks17−86%$50 thousand$50 thousand

A dash means the quantity was not reported for that year. Classes the U.S. did not ship here in either year are left out.

Import duty on machinery in Pakistan

The most-favoured-nation (MFN) duty applied to each machine class, as a simple average of the national tariff lines under its HS subheading[2]. Preferential rates under trade agreements can be lower.

Import duty on machinery in Pakistan
Machine classHS subheadingMFN applied dutyRange across linesTariff year[2]
Excavators8429.520%–2023
Wheel loaders8429.510%–2023
Crawler dozers8429.110%–2023
Motor graders8429.200%–2023
Backhoes and other excavating machines8429.590%–2023
Crawler and rough-terrain cranes8426.410%–2023
Forklifts and telehandlers8427.200%–2023
Off-highway dump trucks8704.1030%–2023
Wheeled tractors8701.9314%11–16%2023
Crawler tractors8701.3030%–2023
Combine harvesters8433.513%–2023
Self-propelled drill rigs8430.410%–2023
Crushers8474.200%–2023
Diesel generator sets8502.139.5%3–16%2023
Truck-mounted cranes8705.1030%–2023

The range shows the lowest and highest line within the subheading; a dash means every line has the same rate.

Worked example: a $100,000 excavator

Import duty: 0% of $100,000 CIF is $0 (HS 8429.52, 2023 tariff)[2].

Sales tax: 18% of the duty-inclusive $100,000 is $18,000[4]

Total duty and tax: $18,000, or 18% of CIF.

  • Excise, port charges, broker fees and any registration tax are extra. The final rate depends on the exact tariff line your broker declares.

Vehicles and other taxes

Pakistan is right-hand-drive. Used cars can generally only be imported by overseas Pakistanis under the transfer-of-residence, gift, or baggage schemes, up to 3 years old, with high engine-based duties (rising sharply with engine size).

Source: Federal Board of Revenue (FBR) / Pakistan Customs, checked June 2026.

  • Import duty: High, engine-based (e.g. ~50% up to 1,300cc, higher above)
  • VAT: Sales tax and additional levies apply
  • Other charges: Regulatory duty and withholding tax by engine size
  • Age limits: Used cars must be right-hand-drive and no older than 3 years, and are importable mainly by overseas Pakistanis via TR/gift/baggage schemes. New vehicles and machinery follow standard rules.

Documents for Pakistan

The papers a machinery shipment to Pakistan usually needs at destination. Your consignee and their customs broker confirm the list for the exact cargo.

  • Commercial Invoice
  • Packing List
  • Bill of Lading
  • Certificate of Origin
  • Import License
  • Inspection Certificate (if required)
  • Equipment Specifications

U.S. export rules

What every shipment from the U.S. has to clear before it sails, whatever the destination.

Electronic Export Information (15 CFR 30)U.S. Census Bureau

Electronic Export Information is filed in AES for each Schedule B number worth more than $2,500 going to one consignee on one conveyance, and for every vehicle whatever its value. For vessel cargo it is due at least 24 hours before loading; the Internal Transaction Number (ITN) goes to the carrier with the booking.[5][6]

Applies to: Any Schedule B line over $2,500, and every vehicle

Used self-propelled vehicles: 72-hour ruleU.S. Customs and Border Protection

U.S. regulations count self-propelled construction and agricultural machinery as vehicles. A used one must be filed in AES at least 72 hours before export, whatever its value or destination, and the ITN, the VIN or serial number and the ownership documents go to CBP at the port of export. Filing after departure is not allowed.[7][8][6]

Applies to: Used machines that drive: excavators, loaders, dozers, tractors, trucks

ISPM 15 wood packagingIPPC, administered in the U.S. by USDA APHIS

Wood packaging and dunnage must be heat-treated to a core temperature of 56 °C for at least 30 minutes, or fumigated, and carry the IPPC mark with the US country code, the facility number and HT or MB. Marked wood can be reused; repaired or remanufactured wood must be treated and marked again.[9]

Applies to: Crates, skids, blocking and dunnage

Export classification under the EAR (ECCN or EAR99)BIS (U.S. Department of Commerce)

An item subject to the EAR is either listed on the Commerce Control List under an Export Control Classification Number (ECCN) or classified EAR99, the basket for items not listed. The ECCN’s reasons for control, read against the Commerce Country Chart, decide whether the destination needs a license. An EAR99 item rarely needs one, but no item, EAR99 included, may go to a person under a denial order or to a prohibited end use or end user without BIS authorization.[10][11][12]

Applies to: Every export of goods subject to the Export Administration Regulations

Clearance notes for Pakistan

  • Karachi and Port Qasim are the main gateways.
  • Confirm scheme eligibility (overseas Pakistani) and engine-based duty before shipping.

Questions buyers ask

How much heavy equipment does the U.S. ship to Pakistan?

U.S. exporters reported 246 machines worth $7.63 million to Pakistan in 2025 across 15 machine classes, up 86% on 2024. The largest class by value was wheel loaders, at $2.71 million. Figures are U.S. export declarations reported to UN Comtrade.

How long does shipping from the U.S. to Pakistan take?

None of the carrier schedules we track lists a direct call in Pakistan. Cargo moves on container lines, usually through a transshipment hub, or on a RoRo or breakbulk sailing to Port of Karachi; we confirm the current routing and transit with each quote.

Can I ship machinery to Pakistan by RoRo?

RoRo service: Limited from all U.S. coasts. RoRo suits machines that drive or tow on board. Ports that take RoRo cargo: Port of Karachi. Where RoRo does not run, machines ship on flat racks or as breakbulk.

What duty and VAT apply to a used excavator in Pakistan?

The MFN duty on excavators averages 0% of CIF, and Sales tax is 18% on the duty-inclusive value. On a $100,000 CIF excavator that comes to $18,000 before excise, port and broker charges.

Which documents do I need to ship to Pakistan?

A shipment to Pakistan usually needs: Commercial Invoice, Packing List, Bill of Lading, Certificate of Origin, Import License, Inspection Certificate (if required), Equipment Specifications. From the U.S., the export filing (EEI) goes in before loading, and titled machines need their title at the port 72 hours before export.

Export checklist (PDF)

A one-page checklist with the facts on this page for shipping Pakistan: methods, duty, rules and documents. Give it to your customs broker.

Download the checklist

Sources

Every figure on this page comes from the documents below, each checked on the date shown. Carriers and authorities revise them, so we confirm the current figure when we book.

  1. [1]World Bank WITS, UN Comtrade: exports reported by the United States, checked October 18, 2026
  2. [2]UNCTAD TRAINS via World Bank WITS: MFN applied tariff, checked October 18, 2026
  3. [3]Höegh Autoliners, Main trade routes (Annual Report 2023), checked October 18, 2026
  4. [4]Federal Board of Revenue, Sales Tax Act 1990 (amended up to 30.06.2026), checked October 2026
  5. [5]eCFR, 15 CFR 30.37 Miscellaneous exemptions (Foreign Trade Regulations), checked October 18, 2026
  6. [6]U.S. Census Bureau, Foreign Trade Regulations FAQs, checked October 18, 2026
  7. [7]eCFR, 19 CFR 192.1 Definitions (used self-propelled vehicles), checked October 18, 2026
  8. [8]U.S. Customs and Border Protection, Exporting used self-propelled vehicles, checked October 18, 2026
  9. [9]USDA APHIS, Export ISPM 15-compliant wood packaging material, checked October 18, 2026
  10. [10]eCFR, 15 CFR 734.3 Items subject to the EAR (EAR99), checked October 18, 2026
  11. [11]eCFR, 15 CFR 738.4 Determining whether a license is required, checked October 18, 2026
  12. [12]eCFR, 15 CFR 732.3 Steps regarding the ten general prohibitions, checked October 18, 2026

Send us the machine and the destination

Give us the model or the measured dimensions and weight. We come back with the method, the sailing and a price, and the figures behind them.