+1 (888) 996-7619|18+ Years of Excellence|
Shipping to Tunisia
Tunisia flagAfrica

Shipping Heavy Equipment to Tunisia

Tunisia's manufacturing sector and strategic Mediterranean location make it an accessible market for heavy equipment. Modern port facilities and streamlined customs procedures facilitate efficient imports.

14-21 days
Transit Time
3
Main Ports
6+
Routes/Month

Main Ports

  • Port of Radès
  • Port of Sfax
  • Port of Bizerte

Shipping Methods

  • RoRo (Roll-on/Roll-off)
  • Flat Rack Container
  • Breakbulk

Key Regulations

  • Institut National de la Normalisation (INNORPI)
  • Technical Control
  • Free Zone Benefits

Common Cargo

  • Manufacturing Equipment
  • Construction Machinery
  • Agricultural Equipment

Main Ports in Tunisia

Port of Radès

Major Seaport

ContainerRoRoBreakbulkHeavy Lift

Port of Sfax

Major Seaport

ContainerBreakbulkGeneral Cargo

Port of Bizerte

Industrial Port

BreakbulkRoRoProject Cargo

Shipping Routes & Transit Times to Tunisia

From (US Port)ToServiceEst. Transit
New York / NJPort of RadèsContainer / RoRo14–21 days

Transit times are indicative port-to-port estimates and vary by carrier, season, and sailing schedule.

U.S. Departure Ports for Shipping to Tunisia

We ship to Tunisia (Port of Radès) from every major U.S. port. Typical ocean transit is 14-21 days.

Import Duty, VAT & Taxes for Tunisia

Tunisia mainly allows vehicle imports through the returning-resident (RCR/FCR) scheme; a 2026 Finance Law measure adds a tax exemption for one used car aged 5–8 years with an engine up to 1,200cc per family. Standard imports face high duty plus 19% VAT and a consumption tax.

Import Duty
High by HS code (RCR scheme for residents)
VAT / Sales Tax
19%
Other Taxes & Fees
Consumption tax by engine size; EV reduced rates

Source: Direction Générale des Douanes (Tunisia) / 2026 Finance Law · Last verified: June 2026

Import Regulations & Requirements

Institut National de la Normalisation (INNORPI)

Equipment must comply with Tunisian standards administered by INNORPI.

Technical Control

Certain equipment categories require technical control and inspection on arrival.

Free Zone Benefits

Equipment imported for free zone operations may benefit from duty exemptions.

Required Documentation

Commercial Invoice
Packing List
Bill of Lading
Certificate of Origin
Equipment Specifications
Import Declaration
Technical Documentation

Customs & Clearance Notes for Tunisia

  • Radès (Tunis) is the main gateway; most imports use the returning-resident (RCR) framework.
  • Tunisia is left-hand-drive.

Frequently Asked Questions

Plan your shipment to Tunisia

Ready to Ship to Tunisia?

Get expert logistics support for your shipment to Tunisia. We handle customs, documentation, and delivery coordination.