Pile Drivers & Hammers shipping and transport
Construction Equipment

Pile Drivers & Hammers Shipping

Pile Driver & Piling Equipment Shipping

50+
Rigs Shipped/Year
150T
Max Weight
BB/RoRo
Methods
Turnkey
Available

Ship Your Pile Drivers & Hammers

Get expert advice on the best shipping solution for your equipment.

Overview

Piling equipment includes base machines (typically modified cranes or purpose-built rigs), leaders/masts, and the pile driving hammers themselves. Each component requires specialized handling.

Hammers can be diesel impact, hydraulic impact, or vibratory types. Large hammers can weigh 30+ tons and require careful lifting and securing.

We coordinate complete piling spread moves including all equipment and support items.

Typical Specifications

Hammer Weight5 - 100+ metric tons
Rig Weight50 - 200 metric tons
Leader Length20m - 50m
Power Pack Weight10 - 40 tons

Recommended Shipping Methods

Breakbulk/Heavy Lift

Recommended

Primary method for heavy hammers and rigs.

Flat Rack Container

Recommended

Good for leader sections and smaller hammers.

RoRo

For base machines if within limits.

Heavy Haul Trucking

Recommended

Multi-load coordination for complete spreads.

Container, flat rack, RoRo or breakbulk?

We quote in this order because it is usually cheapest first. Most machines that look too big for a box fit once our crew takes off the bucket, boom, cab or wheels; larger ones are taken further apart across several containers, and pieces too big or heavy for a flat rack or roll trailer go breakbulk.

01Container

Work needed
We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
Destinations
Widest: almost every port worldwide, plus inland delivery by rail.
Typical cost
Usually the lowest, with no out-of-gauge surcharges.
Protection
Sealed steel box; loose parts and attachments travel locked inside.
Best for
Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.

02Flat rack

Work needed
Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
Destinations
Most container ports, on the same vessels as containers.
Typical cost
Moderate; rises with every centimetre out of gauge.
Protection
Open to the weather; we protect cabs, electronics and hydraulics.
Best for
Excavators, dozers and loaders too wide for a container door.

03RoRo

Work needed
Drives on assembled; non-runners go on a roll trailer.
Destinations
Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
Typical cost
Often competitive for large self-propelled machines where a lane exists.
Protection
Below deck, but loose items and attachments cannot ride inside the cab.
Best for
Running machines going to a port with regular RoRo sailings.

04Breakbulk

Work needed
Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
Destinations
Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
Typical cost
Usually the highest for a single small machine; often the only option for the largest pieces.
Protection
In the hold or lashed on deck; we crate, wrap and protect exposed parts.
Best for
Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.

Handling & Preparation Requirements

  • Hammer removed from leader
  • Leader sections disassembled
  • Power pack disconnected
  • Hydraulic systems flushed/protected
  • All components inventoried
  • Lifting points identified

Common Models We Ship

IHC S-280, S-2300Delmag D100, D200Junttan HHK, PM20APE D80-42, D180-42ICE 1412, 80S

Frequently Asked Questions

Can pile hammers ship assembled?

Hammers typically ship as complete units. Very large hammers may require some disassembly.

How many loads for a complete piling rig?

A typical piling spread (rig, leader, hammer, power pack, tooling) requires 4-8 truckloads depending on size.

Do you handle marine piling equipment?

Yes, including barge-mounted rigs. We coordinate with marine operators for specialized handling.