Skip to main content
+1 (888) 996-7619|18+ Years of Excellence|
Coil Tubing Units shipping and transport
Oil & Gas Equipment

Coil Tubing Units Shipping

A coiled tubing unit ships as its truck or trailer with the reel and injector, by RoRo or as breakbulk. The reel is often the heaviest single piece.

Years shipping heavy equipment[1]
18+
Countries we have shipped to[1]
154
Country shipping guides on this site[2]
153

Overview

Coiled tubing units combine a tubing reel, an injector head, a power pack and a control cab on a truck or trailer, or as skids for offshore work. Truck- and trailer-mounted units ship by RoRo from Houston, Baltimore or Brunswick where a lane serves the destination, provided the axle loads with the reel fitted are within the carrier's ramp limits.

A full reel of tubing is very heavy, so the reel often ships separately as breakbulk or on a flat rack: the 40 ft flat rack carries about 39,000 kg on a 12.06 m deck. Skid units go on flat racks, and spares and tools go in 40 ft high cubes.

The tubing is flushed and preserved, the injector is secured in its transport frame, and hydraulic systems are checked for leaks.

We have no coiled tubing units in our own loading records, so this page sets out the method rather than a past plan. We plan from the unit's transport drawing and axle loads before booking.

Send the make, model and serial number, the reel size and whether the injector, control cab and reel ship as one trailer or separate skids. The coil on the reel is heavy, so the reel weight decides the method. Drain fluids before shipping.

Cost depends on whether the unit ships as one trailer or as separate skids. A trailer unit goes by RoRo, priced by the cubic metres of the trailer, and a heavy reel on its own often ships as breakbulk, priced by weight or volume, whichever is greater.

Typical Specifications

Typical Specifications
UnitsTubing reel, injector head, power pack, control cabin
MountTruck or trailer
Weight25 - 50+ metric tons (package)
TransportRoRo, flat rack, or breakbulk

Recommended Shipping Methods

Worked example

Truck-mounted CTU, 1.5 in tubing string: 42 ft 8 in / 13 m long, 8 ft 6 in / 2.6 m wide, 13 ft 5 in / 4.1 m high, 70,500 lb / 32,000 kg.

The ladder below is worked out from these figures. Larger or smaller units of the same type can land on a different rung.

Cheapest first: the shipping cost ladder

We price every machine from the bottom rung up. A machine only moves up a rung when a measurement rules out the cheaper method.

Truck-mounted CTU, 1.5 in tubing string is 42 ft 8 in / 13 m long, more than a 39 ft 7 in / 12.06 m flat rack deck, so it drives or tows aboard a RoRo vessel.

  1. Rung 1

    Container

    Lowest cost

    When: Fits through a 7 ft 8 in / 2.34 m × 8 ft 6 in / 2.58 m door and under 59,500 lb / 27,000 kg, whole or after we take off the bucket, boom, cab or wheels.

  2. Rung 2

    Flat rack

    Mid cost

    When: Too wide or tall for a container door, but within 14 ft 9 in / 4.5 m wide, 13 ft 1 in / 4 m tall and 86,000 lb / 39,000 kg on one rack.

  3. Rung 3

    RoRo

    Mid cost

    Best fit for Truck-mounted CTU, 1.5 in tubing string

    When: Drives or tows aboard, under 19 ft 8 in / 6 m tall and 110 US tons / 100,000 kg, going to a port with regular RoRo sailings.

  4. Rung 4

    Breakbulk

    Highest cost

    When: Past flat-rack and roll-trailer limits, or shipped as modules lifted aboard piece by piece.

  • RoRo (Roll-on/Roll-off)

    Recommended

    For drivable truck-mounted units within limits.

  • Flat Rack Container

    Recommended

    For reels, injectors, and skid units.

  • Breakbulk / Heavy Lift

    For heavy or over-dimension packages.

  • Heavy Haul Trucking

    Recommended

    Inland transport to the port.

Container, flat rack, RoRo or breakbulk?

01Container

Work needed
We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
Destinations
Widest: almost every port worldwide, plus inland delivery by rail.
Typical cost
Usually the lowest, with no out-of-gauge surcharges.
Protection
Sealed steel box; loose parts and attachments travel locked inside.
Best for
Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.

02Flat rack

Work needed
Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
Destinations
Most container ports, on the same vessels as containers.
Typical cost
Moderate; rises with every centimetre out of gauge.
Protection
Open to the weather; we protect cabs, electronics and hydraulics.
Best for
Excavators, dozers and loaders too wide for a container door.

03RoRo

Work needed
Drives on assembled; non-runners go on a roll trailer.
Destinations
Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
Typical cost
Often competitive for large self-propelled machines where a lane exists.
Protection
Below deck, but loose items and attachments cannot ride inside the cab.
Best for
Running machines going to a port with regular RoRo sailings.

04Breakbulk

Work needed
Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
Destinations
Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
Typical cost
Usually the highest for a single small machine; often the only option for the largest pieces.
Protection
In the hold or lashed on deck; we crate, wrap and protect exposed parts.
Best for
Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.

Handling & Preparation Requirements

  • Secure the tubing reel and injector head
  • Protect the control cabin and electronics
  • Drain/secure fluids per carrier rules
  • Reduce fluids and disconnect batteries for ocean shipment
  • Document the package list and condition

Common Models We Ship

  • NOV coil tubing units
  • Stewart & Stevenson CTU
  • Hydra Rig / Halliburton units
  • SLB / well intervention packages

Where coil tubing units shipments go wrong

Mistakes we see on coil tubing units bookings, and what avoids them.

  • Used coiled tubing has a fatigue life tracked run by run, so a reel shipped without its string log may have to be scrapped by the buyer's engineers.
  • The injector gooseneck guide arch is long and easily bent, so it needs its own crate and a separate line on the packing list rather than riding loose on the unit.
  • Tubing left full of brine or under nitrogen must be blown down, depressurised, and capped at both ends, or the carrier may treat the reel as a pressurised item.

Frequently Asked Questions

How do coil tubing units ship?

Drivable truck-mounted units can use RoRo; reels and injectors often ship on flat racks.

Is the reel shipped separately?

Depending on the unit, the reel may ship with the truck or as a separate flat-rack piece.

Do you ship complete intervention packages?

Yes, we consolidate the full coil tubing/well-intervention package for export.

Sources

Every figure on this page comes from the documents below, each checked on the date shown. Carriers and authorities revise them, so we confirm the current figure when we book.

  1. [1]Seaway Project Cargo: about the company, checked October 22, 2026
  2. [2]Seaway Project Cargo country shipping guides, checked October 22, 2026

Ready to Ship Your Coil Tubing Units?

Send the make, model and pickup location. We quote coil tubing units by container, flat rack or RoRo from the U.S. port that suits the machine.