Skip to main content
+1 (888) 996-7619|18+ Years of Excellence|
Mud Pumps shipping and transport
Oil & Gas Equipment

Mud Pumps Shipping

A triplex mud pump ships on its skid, on a flat rack or in an open top by size. Fluid ends, liners and spares go in containers.

Years shipping heavy equipment[1]
18+
Countries we have shipped to[1]
154
Country shipping guides on this site[2]
153

Overview

Mud pumps are heavy and compact, and they ship on their skids. Smaller pumps that pass the 2.34 m by 2.58 m door of a 40 ft high cube go in one, but weight runs out before space does, because a high cube carries about 26,500 kg. Larger triplex pumps with their motors and skids go on a 40 ft flat rack, which carries about 39,000 kg on a 12.06 m deck, or in an open top lifted in by crane.

The fluid end is drained and flushed of mud, the power end oil is drained or preserved, and suction and discharge flanges are blanked. Pulsation dampeners are depressurised.

Fluid-end modules, liners, pistons and valves are packed as spares in high cubes, spread across boxes to stay within payload.

We have no mud pumps in our own loading records, so this page sets out the method rather than a past plan. Breakbulk and container sailings leave from Houston and other Gulf ports. We plan from the pump's data sheet and photos before booking.

Send the pump make, model and horsepower, and say whether it is skid mounted with an engine or motor. Ask the seller for the skid weight and lift points. Drain the fluid end, gearbox and engine before shipping.

Cost depends on the skid's weight and dimensions. A pump skid over a flat rack's limits ships as breakbulk, priced by weight or volume, whichever is greater. Smaller pumps and fluid end parts fit containers at a per-box rate, which is usually the cheaper route.

Typical Specifications

Typical Specifications
TypeTriplex or duplex, skid-mounted
PowerUp to 2,200 HP
Weight20 - 45+ metric tons
TransportFlat rack or breakbulk

Recommended Shipping Methods

Worked example

NOV 12-P-160 triplex on skid (1,600 hp): 23 ft / 7 m long, 10 ft 2 in / 3.1 m wide, 9 ft 6 in / 2.9 m high, 70,500 lb / 32,000 kg.

The ladder below is worked out from these figures. Larger or smaller units of the same type can land on a different rung.

Cheapest first: the shipping cost ladder

We price every machine from the bottom rung up. A machine only moves up a rung when a measurement rules out the cheaper method.

NOV 12-P-160 triplex on skid (1,600 hp) weighs 70,500 lb / 32,000 kg, over the 58,400 lb / 26,500 kg a 40 ft container carries, so shipping it whole starts on the next rung up.

  1. Rung 1

    Container

    Lowest cost

    When: Fits through a 7 ft 8 in / 2.34 m × 8 ft 6 in / 2.58 m door and under 59,500 lb / 27,000 kg, whole or after we take off the bucket, boom, cab or wheels.

  2. Rung 2

    Flat rack

    Mid cost

    Best fit for NOV 12-P-160 triplex on skid (1,600 hp)

    When: Too wide or tall for a container door, but within 14 ft 9 in / 4.5 m wide, 13 ft 1 in / 4 m tall and 86,000 lb / 39,000 kg on one rack.

  3. Rung 3

    RoRo

    Mid cost

    When: Drives or tows aboard, under 19 ft 8 in / 6 m tall and 110 US tons / 100,000 kg, going to a port with regular RoRo sailings.

  4. Rung 4

    Breakbulk

    Highest cost

    When: Past flat-rack and roll-trailer limits, or shipped as modules lifted aboard piece by piece.

  • Flat Rack Container

    Recommended

    Common for skid-mounted mud pumps.

  • Breakbulk / Heavy Lift

    Recommended

    For the heaviest pump packages.

  • Heavy Haul Trucking

    Recommended

    Inland transport to the port.

Container, flat rack, RoRo or breakbulk?

01Container

Work needed
We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
Destinations
Widest: almost every port worldwide, plus inland delivery by rail.
Typical cost
Usually the lowest, with no out-of-gauge surcharges.
Protection
Sealed steel box; loose parts and attachments travel locked inside.
Best for
Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.

02Flat rack

Work needed
Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
Destinations
Most container ports, on the same vessels as containers.
Typical cost
Moderate; rises with every centimetre out of gauge.
Protection
Open to the weather; we protect cabs, electronics and hydraulics.
Best for
Excavators, dozers and loaders too wide for a container door.

03RoRo

Work needed
Drives on assembled; non-runners go on a roll trailer.
Destinations
Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
Typical cost
Often competitive for large self-propelled machines where a lane exists.
Protection
Below deck, but loose items and attachments cannot ride inside the cab.
Best for
Running machines going to a port with regular RoRo sailings.

04Breakbulk

Work needed
Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
Destinations
Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
Typical cost
Usually the highest for a single small machine; often the only option for the largest pieces.
Protection
In the hold or lashed on deck; we crate, wrap and protect exposed parts.
Best for
Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.

Handling & Preparation Requirements

  • Engineer lift points for the dense skid
  • Secure fluid ends, liners, and dampeners
  • Protect the power end and gear
  • Plan lashing for the high-density load
  • Document model, HP, and condition

Common Models We Ship

  • National Oilwell Varco (NOV) 12-P-160
  • Gardner Denver PZ / FXX
  • Emsco FB / Continental pumps
  • Bomco / Honghua mud pumps

Where mud pumps shipments go wrong

Mistakes we see on mud pumps bookings, and what avoids them.

  • Drilling mud left in the fluid end modules hardens around valves and seats, so we flush and dry the modules and coat the bores with preservative before closing them.
  • Pulsation dampeners are precharged with nitrogen, and shipping them pressurised creates a dangerous-goods issue, so bleed them to zero and tag them as uncharged.
  • Power-end oil drained for shipment must be refilled before start-up, and buyers who run a pump straight off the vessel on residual oil can score the crankshaft bearings.

Frequently Asked Questions

How are mud pumps shipped?

Skid-mounted mud pumps typically ship on flat racks or as breakbulk due to their density.

Can you ship a complete mud system?

Yes, pumps, tanks, and solids-control equipment can be shipped together as a system.

Do you engineer the lift plan?

Yes, we engineer lift points and lashing for these heavy, compact units.

Sources

Every figure on this page comes from the documents below, each checked on the date shown. Carriers and authorities revise them, so we confirm the current figure when we book.

  1. [1]Seaway Project Cargo: about the company, checked October 22, 2026
  2. [2]Seaway Project Cargo country shipping guides, checked October 22, 2026

Ready to Ship Your Mud Pumps?

Send the make, model and pickup location. We quote mud pumps by container, flat rack or RoRo from the U.S. port that suits the machine.