
Part of Liquidity Services, Inc.Shipping from AllSurplus Business Surplus Auctions
AllSurplus lots sit at seller and agency sites across the United States, so the best export port depends on where the machine is. The table below gives the closest container and RoRo port from each region, and we confirm the route as soon as we know the pickup address.
AllSurplus at a glance
AllSurplus, run by Liquidity Services, the owner of GovDeals, sells surplus equipment and vehicles for businesses. Lots stay at the seller's site, payment is usually due within 5 business days, and removal within 10 business days.
- Site type
- Seller and agency sites nationwide
- Auction company
- AllSurplusLiquidity Services, Inc.
- Removal deadline
- Within 10 business days, unless the listing says otherwise.
- Equipment sold here
- Industrial MachineryConstruction EquipmentTrucks & TrailersEnergy Equipment
Best export ports by pickup region
AllSurplus machines can be anywhere in the country. These are the closest container and RoRo ports from a typical pickup point in each region; your quote uses the actual address.
| Pickup region | Container and flat rack | RoRo |
|---|---|---|
| Pacific Northwest (Yakima, WA) | Port of Seattle145 mi, about 3 h | Port of Tacoma155 mi, about 3 h |
| California (Fresno) | Port of Oakland177 mi, about 3.5 h | Port of Hueneme230 mi, about 4.5 h |
| Southwest (Phoenix) | Port of Los Angeles / Long Beach382 mi, about 7.5 h | Port of Los Angeles / Long Beach382 mi, about 7.5 h |
| Mountain West (Denver) | Port of Los Angeles / Long Beach1,033 mi, about 20.5 hContainers: usually railed from the Denver intermodal rail ramps, 6 mi away | Port of Los Angeles / Long Beach1,033 mi, about 20.5 h |
| Northern Plains (Sioux Falls, SD) | Port of Houston1,108 mi, about 22 hContainers: usually railed from the Kansas City intermodal rail ramps, 391 mi away | Port of Houston1,108 mi, about 22 h |
| Texas (Dallas–Fort Worth) | Port of Houston267 mi, about 5.5 hContainers: usually railed from the Dallas–Fort Worth intermodal rail ramps, 17 mi away | Port of Houston267 mi, about 5.5 h |
| Corn Belt (Des Moines, IA) | Port of Houston961 mi, about 19 hContainers: usually railed from the Kansas City intermodal rail ramps, 227 mi away | Port of Houston961 mi, about 19 h |
| Great Lakes (Indianapolis) | Port of Baltimore599 mi, about 12 hContainers: usually railed from the Chicago intermodal rail ramps, 185 mi away | Port of Baltimore599 mi, about 12 h |
| Southeast (Atlanta) | Port of Savannah249 mi, about 5 h | Port of Brunswick (Colonel's Island)278 mi, about 5.5 h |
| Florida (Orlando) | Port of Jacksonville (JAXPORT)146 mi, about 3 h | Port of Jacksonville (JAXPORT)146 mi, about 3 hOr Brunswick, the busiest U.S. RoRo gateway: 201 mi |
| Northeast (Harrisburg, PA) | Port of Baltimore85 mi, about 1.5 h | Port of Baltimore85 mi, about 1.5 h |
Road miles from OSRM (OpenStreetMap), calculated October 2026. Truck hours assume a 50 mph average for a loaded lowboy, including stops.
Methods from this location
Machinery crated or blocked in containers
Oversized equipment on flat rack containers
Wheeled and tracked units where a lane serves the destination
Pickup from the seller site
Container is usually the cheapest option, and we do the partial disassembly needed to make the machine fit. How we containerize heavy equipment
Container, flat rack, RoRo or breakbulk?
We quote in this order because it is usually cheapest first. Most machines that look too big for a box fit once our crew takes off the bucket, boom, cab or wheels; larger ones are taken further apart across several containers, and pieces too big or heavy for a flat rack or roll trailer go breakbulk.
01Container
Best fit- Work needed
- We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
- Destinations
- Widest: almost every port worldwide, plus inland delivery by rail.
- Typical cost
- Usually the lowest, with no out-of-gauge surcharges.
- Protection
- Sealed steel box; loose parts and attachments travel locked inside.
- Best for
- Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.
02Flat rack
- Work needed
- Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
- Destinations
- Most container ports, on the same vessels as containers.
- Typical cost
- Moderate; rises with every centimetre out of gauge.
- Protection
- Open to the weather; we protect cabs, electronics and hydraulics.
- Best for
- Excavators, dozers and loaders too wide for a container door.
03RoRo
- Work needed
- Drives on assembled; non-runners go on a roll trailer.
- Destinations
- Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
- Typical cost
- Often competitive for large self-propelled machines where a lane exists.
- Protection
- Below deck, but loose items and attachments cannot ride inside the cab.
- Best for
- Running machines going to a port with regular RoRo sailings.
04Breakbulk
- Work needed
- Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
- Destinations
- Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
- Typical cost
- Usually the highest for a single small machine; often the only option for the largest pieces.
- Protection
- In the hold or lashed on deck; we crate, wrap and protect exposed parts.
- Best for
- Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.
After you win at AllSurplus
- 1Pay within 5 business days, or the deadline in the listing.
- 2Send us the paid invoice, the seller contact and the pickup address.
- 3We collect the machine, load it with our own carrier and take it to the port, or first to our facility if it needs partial disassembly to fit a container.
- 4We file the export declaration (EEI) in the Automated Export System. It is required when any Schedule B line is worth more than $2,500 or needs an export license, and its ITN confirmation goes to the carrier at least 24 hours before the vessel loads.
- 5For titled machines and vehicles, the original title and the EEI go to U.S. Customs at the port at least 72 hours before export. Without them the unit cannot sail.
- 6We send you the bill of lading and the documents your customs broker needs to clear the machine at destination.
AllSurplus buyer terms
- Payment
- Within 5 business days, unless the listing says otherwise. Source
- Removal deadline
- Within 10 business days, unless the listing says otherwise. Source
- Loading
- The buyer is responsible for packing, loading and transport. Source
- Late payment
- Overdue amounts carry interest of 18% a year. Source
Checked October 2026. Terms vary by sale, so confirm them on your invoice.
How we work with AllSurplus
- We confirm with the seller whether a forklift or crane is on site before dispatch, because loading is the buyer's job.
- Industrial machines are often crated or skidded for container shipment; we arrange that at the seller's site or at our warehouse.
Why Ship With Us
- We pack, load and remove; AllSurplus and the seller do not
- Industrial rigging and crating
- Pickup inside the 10-business-day window
- Full export documentation
Our Services at This Location
- Pickup from seller sites nationwide
- Rigging and loading coordination for industrial equipment
- Full export documentation
- Crating and blocking for ocean transport
Common destinations from AllSurplus
Container and flat rack services reach all of these. RoRo depends on the lane from the East and Gulf Coast, so it is shown separately.
| Destination | Ocean transit | RoRo from this coast |
|---|---|---|
| 21-30 days | Regular sailings | |
| 20-28 days | Regular sailings | |
| 18-25 days | Regular sailings | |
| 20-28 days | Regular sailings | |
| 22-32 days | Limited sailings | |
| 5-14 days | No regular lane: container or flat rack | |
| 12-18 days | Regular sailings | |
| 18-28 days | Limited sailings |
Transit times are typical port-to-port ranges. Every quote confirms the current schedule.
Common mistakes to avoid
- Assuming the seller will load. AllSurplus terms put packing and loading on the buyer.
Frequently Asked Questions
Does AllSurplus ship or load?
No. The buyer arranges all packing, loading and transport, so we schedule the pickup with the seller and bring the right equipment.
Is AllSurplus the same as GovDeals?
Both are run by Liquidity Services. GovDeals sells government surplus; AllSurplus sells business and industrial surplus.
Machines bought at AllSurplus that we load in containers
Buyers at AllSurplus ship these kinds of machines with us. Each card shows the boxes from our loading records; open a brand for every model.
Motor grader
CAT 12
1 × 40 ft high cube
Caterpillar loading plansExcavator
CAT 206B
1 × 45 ft high cube
Caterpillar loading plansWheel loader
Komatsu 180-1
1 × 20 ft container
Komatsu loading plansWheel loader
Komatsu 180-3
1 × 40 ft high cube
Komatsu loading plansExcavator
Hitachi EX 150
1 × 40 ft high cube
Hitachi Construction Machinery loading plansExcavator
Hitachi EX 370-5
1 × 40 ft open top (1 ft (0.3 m) over the side walls) + 1 × 40 ft high cube
Hitachi Construction Machinery loading plansWheel loader
Volvo 220D
2 × 40 ft high cube
Volvo Construction Equipment loading plansExcavator
Volvo EC 480EL
1 × 40 ft open top (1 ft (0.3 m) over the side walls) + 2 × 40 ft high cube
Volvo Construction Equipment loading plansWheel loader
Kawasaki 95Z VII
2 × 40 ft high cube + 1 × 20 ft container
Kawasaki loading plans
Ready to Ship from AllSurplus?
Contact us today for fast pickup and reliable worldwide shipping.