Wash Plants shipping and transport
Mining Equipment

Wash Plants Shipping

A mobile wash plant ships with its conveyors folded, by RoRo or on a flat rack. Modular plants ship as tanks, screens, cyclones, pumps and pipework, most of it on flat racks and in containers.

Years shipping heavy equipment[1]
18+
Countries we have shipped to[1]
154
Country shipping guides on this site[2]
153

Overview

Wash plants for sand, aggregate and minerals are either mobile units on wheels or tracks, or modular plants assembled on site. A mobile plant folds its conveyors for transport and then ships like a tracked screen: whole by RoRo where a lane serves the destination, or on a 40 ft flat rack when it fits the 12.06 m deck and about 39,000 kg payload.

Modular plants ship as components: the screen, the sump tank, cyclones, pumps, dewatering screens, thickeners and pipework. Tanks and thickener sections are often wider than the 2.34 m container door and go on flat racks or as breakbulk. Pumps, motors, cyclones and controls go in 40 ft high cubes.

Everything that has carried water and soil is drained, washed and dried before loading, because destination ports inspect for soil and standing water.

We have no wash plants in our own loading records, so this page sets out the method rather than a past plan. Containers and flat racks sail from Houston, Savannah and most US ports. We confirm the plan from the manufacturer's transport drawings before booking.

Send the plant make and model, the component list and whether it is skid-mounted, wheeled or tracked. Wash plants are often a set of screens, cyclones, pumps and tanks, and each needs its own plan. Drain every tank and pump and clean out sand and silt before shipping.

Cost depends on the number of components and how many boxes they fill. Pumps, cyclones and smaller screens pack in containers at a per-box rate, and large screens or tanks go on flat racks. Trucking from the plant to the port is quoted on top.

Typical Specifications

Typical Specifications
ModulesScrubber, screens, sand screws, cyclones, tanks
Heaviest Lifts15 - 40+ metric tons per module
TransportModularized multi-load shipment
ConveyorsFolded or shipped separately

Recommended Shipping Methods

Worked example

Twin-shaft log washer module (largest load): 36 ft 1 in / 11 m long, 10 ft 6 in / 3.2 m wide, 9 ft 2 in / 2.8 m high, 61,700 lb / 28,000 kg.

The ladder below is worked out from these figures. Larger or smaller units of the same type can land on a different rung.

Cheapest first: the shipping cost ladder

We price every machine from the bottom rung up. A machine only moves up a rung when a measurement rules out the cheaper method.

Twin-shaft log washer module (largest load) weighs 61,700 lb / 28,000 kg, over the 58,400 lb / 26,500 kg a 40 ft container carries, so shipping it whole starts on the next rung up.

  1. Rung 1

    Container

    Lowest cost

    When: Fits through a 7 ft 8 in / 2.34 m × 8 ft 6 in / 2.58 m door and under 59,500 lb / 27,000 kg, whole or after we take off the bucket, boom, cab or wheels.

  2. Rung 2

    Flat rack

    Mid cost

    Best fit for Twin-shaft log washer module (largest load)

    When: Too wide or tall for a container door, but within 14 ft 9 in / 4.5 m wide, 13 ft 1 in / 4 m tall and 86,000 lb / 39,000 kg on one rack.

  3. Rung 3

    RoRo

    Mid cost

    When: Drives or tows aboard, under 19 ft 8 in / 6 m tall and 110 US tons / 100,000 kg, going to a port with regular RoRo sailings.

  4. Rung 4

    Breakbulk

    Highest cost

    When: Past flat-rack and roll-trailer limits, or shipped as modules lifted aboard piece by piece.

  • Breakbulk / Heavy Lift

    Recommended

    For large scrubber and screen modules.

  • Flat Rack Container

    Recommended

    For sand screws, conveyors, and tanks.

  • Container Shipping

    Recommended

    For pumps, cyclones, and crated parts.

  • Heavy Haul Trucking

    Recommended

    Permitted inland transport to the port.

Container, flat rack, RoRo or breakbulk?

01Container

Work needed
We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
Destinations
Widest: almost every port worldwide, plus inland delivery by rail.
Typical cost
Usually the lowest, with no out-of-gauge surcharges.
Protection
Sealed steel box; loose parts and attachments travel locked inside.
Best for
Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.

02Flat rack

Work needed
Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
Destinations
Most container ports, on the same vessels as containers.
Typical cost
Moderate; rises with every centimetre out of gauge.
Protection
Open to the weather; we protect cabs, electronics and hydraulics.
Best for
Excavators, dozers and loaders too wide for a container door.

03RoRo

Work needed
Drives on assembled; non-runners go on a roll trailer.
Destinations
Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
Typical cost
Often competitive for large self-propelled machines where a lane exists.
Protection
Below deck, but loose items and attachments cannot ride inside the cab.
Best for
Running machines going to a port with regular RoRo sailings.

04Breakbulk

Work needed
Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
Destinations
Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
Typical cost
Usually the highest for a single small machine; often the only option for the largest pieces.
Protection
In the hold or lashed on deck; we crate, wrap and protect exposed parts.
Best for
Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.

Handling & Preparation Requirements

  • Plan the module load list
  • Fold/secure conveyors and walkways
  • Protect screens, screws, and pumps
  • Manage export documentation for multi-piece shipments
  • Plan reassembly support at destination

Common Models We Ship

  • McLanahan wash plants
  • CDE aggregate washing systems
  • Terex Washing Systems / AggreSand
  • Powerscreen / Trio wash plants

Where wash plants shipments go wrong

Mistakes we see on wash plants bookings, and what avoids them.

  • Polyurethane screen panels and cyclone liners degrade in sunlight, so leaving them exposed on an open flat rack for weeks shortens their life; ship them crated or in a box.
  • Sand left in screw troughs and sumps can weigh several tonnes, so an uncleaned module exceeds its declared weight and fails the verified gross mass check at the terminal.
  • Some water-treatment coagulants packed with a plant are classed as corrosive dangerous goods, so list them separately with safety data sheets instead of hiding them in the parts container.

Frequently Asked Questions

How are wash plants shipped?

As modularized multi-load shipments combining breakbulk, flat rack, and containers.

Do you handle the documentation for a multi-module plant?

Yes, we manage the consolidated export documentation and module load lists.

Can you arrange reassembly?

Yes, we can coordinate technical support for plant reassembly at the destination.

Sources

Every figure on this page comes from the documents below, each checked on the date shown. Carriers and authorities revise them, so we confirm the current figure when we book.

  1. [1]Seaway Project Cargo: about the company, checked October 22, 2026
  2. [2]Seaway Project Cargo country shipping guides, checked October 22, 2026