Skip to main content
+1 (888) 996-7619|18+ Years of Excellence|
GovPlanetPart of RB Global, Inc. (came with the IronPlanet acquisition)

Shipping from GovPlanet Military Surplus

Government facilities and surplus yards nationwide

GovPlanet lots sit at seller and agency sites across the United States, so the best export port depends on where the machine is. The table below gives the closest container and RoRo port from each region, and we confirm the route as soon as we know the pickup address.

GovPlanet at a glance

GovPlanet specializes in government and military surplus equipment auctions. We have expertise navigating the unique requirements of picking up from government facilities and military bases.

Site type
Seller and agency sites nationwide
Auction company
GovPlanetRB Global, Inc. (came with the IronPlanet acquisition)
Removal deadline
8 business days after the auction, or 8 days after the Item Release when an End-Use Certificate is required.
Equipment sold here
Military VehiclesGovernment Fleet EquipmentConstruction EquipmentGeneratorsSupport Equipment

Best export ports by pickup region

GovPlanet machines can be anywhere in the country. These are the closest container and RoRo ports from a typical pickup point in each region; your quote uses the actual address.

Pickup regionContainer and flat rackRoRo
Pacific Northwest (Yakima, WA)Port of Seattle145 mi, about 3 hPort of Tacoma155 mi, about 3 h
California (Fresno)Port of Oakland177 mi, about 3.5 hPort of Hueneme230 mi, about 4.5 h
Southwest (Phoenix)Port of Los Angeles / Long Beach382 mi, about 7.5 hPort of Los Angeles / Long Beach382 mi, about 7.5 h
Mountain West (Denver)Port of Los Angeles / Long Beach1,033 mi, about 20.5 hContainers: usually railed from the Denver intermodal rail ramps, 6 mi awayPort of Los Angeles / Long Beach1,033 mi, about 20.5 h
Northern Plains (Sioux Falls, SD)Port of Houston1,108 mi, about 22 hContainers: usually railed from the Kansas City intermodal rail ramps, 391 mi awayPort of Houston1,108 mi, about 22 h
Texas (Dallas–Fort Worth)Port of Houston267 mi, about 5.5 hContainers: usually railed from the Dallas–Fort Worth intermodal rail ramps, 17 mi awayPort of Houston267 mi, about 5.5 h
Corn Belt (Des Moines, IA)Port of Houston961 mi, about 19 hContainers: usually railed from the Kansas City intermodal rail ramps, 227 mi awayPort of Houston961 mi, about 19 h
Great Lakes (Indianapolis)Port of Baltimore599 mi, about 12 hContainers: usually railed from the Chicago intermodal rail ramps, 185 mi awayPort of Baltimore599 mi, about 12 h
Southeast (Atlanta)Port of Savannah249 mi, about 5 hPort of Brunswick (Colonel's Island)278 mi, about 5.5 h
Florida (Orlando)Port of Jacksonville (JAXPORT)146 mi, about 3 hPort of Jacksonville (JAXPORT)146 mi, about 3 hOr Brunswick, the busiest U.S. RoRo gateway: 201 mi
Northeast (Harrisburg, PA)Port of Baltimore85 mi, about 1.5 hPort of Baltimore85 mi, about 1.5 h

Road miles from OSRM (OpenStreetMap), calculated October 2026. Truck hours assume a 50 mph average for a loaded lowboy, including stops.

Methods from this location

Container

Containerized shipping available

RoRo

For wheeled military vehicles

Breakbulk

Project cargo for large items

Trucking

Pickup from government facilities

Container is usually the cheapest option, and we do the partial disassembly needed to make the machine fit. How we containerize heavy equipment

Container, flat rack, RoRo or breakbulk?

We quote in this order because it is usually cheapest first. Most machines that look too big for a box fit once our crew takes off the bucket, boom, cab or wheels; larger ones are taken further apart across several containers, and pieces too big or heavy for a flat rack or roll trailer go breakbulk.

01Container

Best fit
Work needed
We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
Destinations
Widest: almost every port worldwide, plus inland delivery by rail.
Typical cost
Usually the lowest, with no out-of-gauge surcharges.
Protection
Sealed steel box; loose parts and attachments travel locked inside.
Best for
Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.

02Flat rack

Work needed
Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
Destinations
Most container ports, on the same vessels as containers.
Typical cost
Moderate; rises with every centimetre out of gauge.
Protection
Open to the weather; we protect cabs, electronics and hydraulics.
Best for
Excavators, dozers and loaders too wide for a container door.

03RoRo

Work needed
Drives on assembled; non-runners go on a roll trailer.
Destinations
Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
Typical cost
Often competitive for large self-propelled machines where a lane exists.
Protection
Below deck, but loose items and attachments cannot ride inside the cab.
Best for
Running machines going to a port with regular RoRo sailings.

04Breakbulk

Work needed
Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
Destinations
Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
Typical cost
Usually the highest for a single small machine; often the only option for the largest pieces.
Protection
In the hold or lashed on deck; we crate, wrap and protect exposed parts.
Best for
Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.

After you win at GovPlanet

  1. 1Check the demil code on the lot. If it is F or Q, the item cannot be exported in usable form.
  2. 2Pay in full, and complete the End-Use Certificate and Destination Control Statement if the lot requires them.
  3. 3When the Item Release arrives, send it to us with the invoice. We schedule the pickup with the department named on the release.
  4. 4Tell GovPlanet's title department in advance that a titled vehicle is being exported, so the paperwork is ready before pickup.
  5. 5We collect the machine, load it with our own carrier and take it to the port, or first to our facility if it needs partial disassembly to fit a container.
  6. 6We file the export declaration (EEI) in the Automated Export System. It is required when any Schedule B line is worth more than $2,500 or needs an export license, and its ITN confirmation goes to the carrier at least 24 hours before the vessel loads.
  7. 7For titled machines and vehicles, the original title and the EEI go to U.S. Customs at the port at least 72 hours before export. Without them the unit cannot sail.
  8. 8We send you the bill of lading and the documents your customs broker needs to clear the machine at destination.

GovPlanet buyer terms

Demil F and Q items
Sold only within the United States and only to U.S. citizens; Demil Q items must be mutilated to scrap if they leave the U.S. Source
End-Use Certificate
Required for demil B, C, D, E, F and Q property; approval typically takes 6 to 10 weeks, with no storage fees during approval. Source
Removal deadline
8 business days after the auction, or 8 days after the Item Release when an End-Use Certificate is required. Source
Release
The Item Release form follows final payment and any Trade Security Clearance, and names the department that schedules pickup. Source
Site access
Drivers need personal identification, the paperwork and in some cases proof of insurance to enter a government site. Source
Loading
The buyer rigs, loads and secures; where buyer loading is required, bring your own equipment, certified operators and insurance naming IronPlanet and the DoD. Source
International bidders
Accounts outside the U.S. and Canada need an International Bidders Qualification form and a $2,000 deposit. Source

Checked October 2026. Terms vary by sale, so confirm them on your invoice.

How we work with GovPlanet

  • We send drivers with the identification, release paperwork and insurance certificates government sites ask for, and confirm base access rules before dispatch.
  • Where the lot must be loaded by the buyer, we bring the loading equipment and certified operators.
  • We check the demil code and export classification of every lot before quoting ocean freight, and decline exports the rules do not allow.
  • We declare the U.S. port of export you give GovPlanet at checkout, so the export filing matches.

Why Ship With Us

  • Experience with government surplus logistics
  • Understanding of military base access procedures
  • ITAR export compliance knowledge
  • Title and documentation expertise

Our Services at This Location

  • Government facility pickup coordination
  • Military base access and logistics
  • ITAR/Export compliance assistance
  • Demilitarization documentation
  • Title and registration assistance

Common destinations from GovPlanet

Container and flat rack services reach all of these. RoRo depends on the lane from the East and Gulf Coast, so it is shown separately.

DestinationOcean transitRoRo from this coast
Nigeria21-30 daysRegular sailings
Ghana20-28 daysRegular sailings
Saudi Arabia18-25 daysRegular sailings
United Arab Emirates20-28 daysRegular sailings
Australia28-35 daysRegular sailings
Chile21-28 daysRegular sailings
Guatemala10-16 daysRegular sailings
Philippines18-28 daysLimited sailings

Transit times are typical port-to-port ranges. Every quote confirms the current schedule.

Common mistakes to avoid

  • Bidding on a Demil F or Q item, such as an HMMWV, intending to export it.
  • Planning a pickup before the End-Use Certificate is approved. It takes weeks.
  • Sending a driver to a base without the release, identification or insurance proof.

Frequently Asked Questions

How long does pickup from a military base take?

Base access can take 1-2 weeks to arrange. Once approved, pickup is straightforward.

Can military equipment be exported?

Many items can, but check the demilitarization (DEMIL) and trade security control codes in the listing first. Controlled items may need an End-Use Certificate approved before release, which typically takes 6 to 10 weeks, and some cannot leave the United States at all.

Do you handle the title transfer?

We can coordinate title and registration documentation for government surplus equipment.

Can I export a HMMWV bought on GovPlanet?

Generally no. Tactical vehicles such as HMMWVs are coded Demil Q, and GovPlanet sells Demil F and Q items only within the United States and only to U.S. citizens.

How long does a GovPlanet End-Use Certificate take?

GovPlanet says approval by Trade Security Controls typically takes 6 to 10 weeks after submission. No storage fees are charged while it is pending.

Which GovPlanet items can be exported?

Items coded Demil A need no demilitarization or trade security clearance, though Commerce licensing can still apply. We check each lot's code and classification before quoting.

Machines bought at GovPlanet that we load in containers

Buyers at GovPlanet ship these kinds of machines with us. Each card shows the boxes from our loading records; open a brand for every model.

Quote a machine from GovPlanet

Ready to Ship from GovPlanet?

Contact us today for fast pickup and reliable worldwide shipping.