Skip to main content
+1 (888) 996-7619|18+ Years of Excellence|

Articulated dump truck · Komatsu

How to ship a Komatsu HM400-5 overseas

At 77,300 lb (35,055 kg), the Komatsu HM400-5 is heavier than one container can carry, so it ships whole on a 40 ft flat rack (3 ft 5 in / 1.05 m over width, 5 ft 10 in / 1.79 m over height). RoRo is the alternative where a lane serves your port. It can also be containerized after major disassembly (dump body off, cab or ROPS removed and crated, wheels off, and frame split at the articulation), across at least 2 containers by weight; we survey it first and quote both.

Komatsu HM400-5 shipping dimensions

Weight
77,300 lb (35,055 kg)empty weight
Machine type
Articulated dump truck
Transport length
36 ft 5 in (11.11 m)
Transport width
11 ft 4 in (3.45 m)
Transport height
12 ft 3 in (3.74 m)
Configuration
Empty weight; unloaded height.

Published figures for the configuration shown. Shoes, tyres, buckets, counterweights and options change them, so we confirm the dimensions on your machine before booking.

Every way to ship a Komatsu HM400-5, best first

Worked out from the dimensions above against container, flat rack and RoRo limits. RoRo depends on a regular sailing to your port.

#Best methodFitPreparation
140 ft flat rackBest fitOut-of-gaugeShips assembled, blocked and lashed; out-of-gauge surcharge applies (3 ft 5 in / 1.05 m over width, 5 ft 10 in / 1.79 m over height).
240 ft high-cube containerAfter major disassembly, across containersTaken apart and loaded across at least 2 40 ft containers by weight, with open-tops for tall pieces: dump body off, cab or ROPS removed and crated, wheels off, and frame split at the articulation. We survey the machine first and quote this next to shipping it whole. How we containerize
3RoRoWhere a RoRo lane serves the destinationDrives on assembled where a RoRo lane serves the destination.
4BreakbulkFits as isLifted aboard by crane as breakbulk; used when no flat rack or RoRo option suits the port.

Containerizing a machine means taking off the parts that stop it fitting, then crating, labelling and lashing them in the same box. See how we containerize heavy equipment

Container, flat rack, RoRo or breakbulk?

We quote in this order because it is usually cheapest first. Most machines that look too big for a box fit once our crew takes off the bucket, boom, cab or wheels; larger ones are taken further apart across several containers, and pieces too big or heavy for a flat rack or roll trailer go breakbulk.

01Container

Work needed
We partially disassemble when needed (bucket, boom, cab, wheels), or take larger machines further apart across several high-cubes and open-tops, then crate, block and lash every part.
Destinations
Widest: almost every port worldwide, plus inland delivery by rail.
Typical cost
Usually the lowest, with no out-of-gauge surcharges.
Protection
Sealed steel box; loose parts and attachments travel locked inside.
Best for
Most machines: compact ones as they are, others after partial disassembly, and large ones split across several containers.

02Flat rack

Best fit
Work needed
Ships assembled, blocked and lashed. Surcharges apply when wider than 2.4 m or taller than about 1.95 m.
Destinations
Most container ports, on the same vessels as containers.
Typical cost
Moderate; rises with every centimetre out of gauge.
Protection
Open to the weather; we protect cabs, electronics and hydraulics.
Best for
Excavators, dozers and loaders too wide for a container door.

03RoRo

Work needed
Drives on assembled; non-runners go on a roll trailer.
Destinations
Fewer destinations: regular lanes to Europe, West Africa, the Middle East, Oceania and parts of Latin America.
Typical cost
Often competitive for large self-propelled machines where a lane exists.
Protection
Below deck, but loose items and attachments cannot ride inside the cab.
Best for
Running machines going to a port with regular RoRo sailings.

04Breakbulk

Work needed
Lifted aboard piece by piece by ship’s or shore cranes, on its own skids or cradle, then stowed and lashed in the hold or on deck.
Destinations
Ports with breakbulk berths and heavy-lift cranes; sailings are booked voyage by voyage.
Typical cost
Usually the highest for a single small machine; often the only option for the largest pieces.
Protection
In the hold or lashed on deck; we crate, wrap and protect exposed parts.
Best for
Pieces too large or heavy for a flat rack or roll trailer: transformers, process modules, mining trucks, crane sections.

Preparing a Komatsu HM400-5 for export

  • Tier 4 Final and Stage V engines need ultra-low-sulfur diesel (15 ppm or less) and DEF. Where only high-sulfur diesel is sold, the after-treatment clogs, so check fuel quality or source a lower-tier export machine.
  • Telematics (such as Cat Product Link, Komtrax or JDLink) may stop working abroad; the dealer can transfer or end the subscription before export.
  • HD785 and larger rigid trucks ship with the dump body off; RoRo works where a lane exists, otherwise breakbulk.

Where machines like the Komatsu HM400-5 go

Komatsu HM400-5 shipping questions

Does a Komatsu HM400-5 fit in a shipping container?

At 77,300 lb (35,055 kg), the Komatsu HM400-5 is heavier than one container can carry, so it ships whole on a 40 ft flat rack (3 ft 5 in / 1.05 m over width, 5 ft 10 in / 1.79 m over height). RoRo is the alternative where a lane serves your port. It can also be containerized after major disassembly (dump body off, cab or ROPS removed and crated, wheels off, and frame split at the articulation), across at least 2 containers by weight; we survey it first and quote both.

How much does a Komatsu HM400-5 weigh for shipping?

Komatsu lists the Komatsu HM400-5 at 77,300 lb (35,055 kg) (empty weight). Attachments, counterweight options and fuel change the figure, so the weight on the bill of lading comes from the machine itself.

What are the shipping dimensions of a Komatsu HM400-5?

36 ft 5 in × 11 ft 4 in × 12 ft 3 in (11.11 × 3.45 × 3.74 m) (length × width × height) in transport position, from Komatsu's published specifications. Shoes, tyres and options change them, so we check before booking.

What has to come off a Komatsu HM400-5 to ship it?

To containerize it: dump body off, cab or ROPS removed and crated, wheels off, and frame split at the articulation. Our crew does the work, crates and labels every part, and loads the pieces across at least 2 containers, with documentation for reassembly. Shipped whole on a flat rack or RoRo, it needs little or no disassembly.

Can a Komatsu HM400-5 ship RoRo?

Yes, where a RoRo lane serves your destination port. It drives on under its own power. RoRo from the U.S. reaches fewer countries than containers and flat racks, so we check your port first.